Decking In Weybridge
Bespoke Rad Covers In Weybridge
This is a bespoke rad cover made for a property in Weybridge. The rad cover was made from 18mm mdf. All material was purchased from Champions Timber. This design of rad cover looks outstanding once painted.
Read MoreFence Post Replacement In Weybridge
Decking In Weybridge
Flatpack Assembly Of Chest Of Drawers And Childrens Bed
“Michael was brilliant, phoned him in the morning and he was with us a couple of hours later. Work was completed efficiently and without any problems, would highly recommend.”
Read MoreNew Lapped Panel Fencing In Weybridge
This is a New Lapped Panel Fencing in Weybridge. The client was letting out the property and wanted to make it more secure. After looking at existing fence, the best option was new fence as it would make the property more appealing. Old fence was removed as skipped. New holes were dug out at correct…
Read MoreFlatpack Furniture Assembly In Weybridge
This is a Argos single bunk bed assembled in Weybridge. The full flatpack assembly came in cardboard boxes. First boxes were carried upstairs to bedroom it was for. All items were removed from there boxes and boxes were skipped. Bed was then assembled with a cordless drill and allen keys. Bed was then moved to…
Read MoreOdd Jobs In Weybridge
This is shelving fitted in Weybridge. The client had purchased this item from Ikea to have it fitted in there garage. Items were unpacked from cardboard packaging. All packaging was binned.The client chose the height they wanted shelving to be so installation could start. The tracks for shelves were positioned on wall and holes drilled…
Read MoreLaminate Flooring Weybridge
This is a new laminate floor which was supplied from Howdens Joinery. Old floor was flooring boards. which were checked over and any damaged fixed before installation of new floor over it. Underlay was first rolled out into position then boards were lay. A multi tool was used to cut out under frames so boards…
Read MoreHandcut Roof Weybridge
Replaced 4×2 roof on Pergola as it was old and weak. Supplied and fitted 5×2 C24 treated timber. Handcut and notched out all rafters on site to work to roof layout. Coach bolts used for wall plate to complete strong structure for roof to lay on . Old timber was denailed and skipped.
Read More